Gaming Cabinet Sheet Metal RFQ Checklist: The Files Behind a Quote

A gaming cabinet sheet metal RFQ is judged on what it contains, and most slow quotes are slow because the file set was incomplete rather than because the factory was busy. A budget quote needs a drawing revision, a quantity, a material and a finish; a prototype quote needs critical hole positions, tolerances, fasteners and an acceptance standard on top. This checklist separates the three stages so each RFQ carries exactly what its stage needs. Fabrication scope is on the sheet metal capability page, and the delivery route on the OEM process page.

Key Takeaways

  • Three stages, three file sets: budget, prototype, production. Sending the wrong set is the most common cause of a quote that cannot be used.
  • A drawing without a revision number cannot be quoted, because the quote attaches to a revision.
  • Mark critical dimensions explicitly. A general tolerance note does not tell the factory which hole matters.
  • Material and finish are two decisions, not one. Powder coat colour is a finish; substrate thickness is a material.
  • Hole-to-bend distance and bend radius decide whether the part is formable at all - and they are the items most often missing from a first drawing.
  • First-article inspection is the acceptance document. Agree its format before the first cut, not after the first reject.
Sheet metal components for gaming cabinets after forming and before assembly
Cutting starts only after the drawing set is complete. Files that arrive in stages produce quotes that arrive in stages too.
Diagram of three RFQ stages: budget quote, prototype and production batches, with the files each stage needs
Three stages, three file sets. Sending prototype files for a budget quote slows the quote; sending budget files for a prototype produces a machine that cannot be assembled.

The stage table in section one and the copyable checklist in section five are the artifacts. The middle sections explain the two items that most often stall a quote: missing critical dimensions and unspecified formability.

Minimum Files for a Budget Quote

A budget quote is a feasibility and order-of-magnitude exercise. It needs five things and no more.

ItemFormatWhat it fixes
Drawing revisionPDF plus the native file, named with a revision letter or numberWhich version is being quoted
Overall dimensionsDimensioned views, or a 3D model with a bounding boxMaterial consumption and machine envelope
QuantityUnits per part, and whether one set or a batchSetup amortisation and tooling decision
MaterialSubstrate and thickness, or an acceptable rangeCost basis and formability
FinishPowder coat, paint, plating, or bare; colour reference if colour mattersProcess route and lead time

Missing any one of these does not stop a factory from replying; it stops the reply from being a quote. A response without a revision reference is an estimate, and estimates do not survive the first drawing change.

Drawings and Dimensions for a Prototype

The prototype stage adds the dimensions that decide whether the cabinet can be built and assembled. Four groups, all of which belong on the drawing rather than in the email.

Critical hole positions

Mark the holes that must be exact - board mounting, display bracket, hinge, lock, peripheral bezel - with their own dimensions and tolerances. A drawing with a general tolerance note and no critical callouts invites the factory to apply that note to every hole, including the ones that carry a mounting pattern.

Formability

Bend radius, hole-to-bend distance, and the minimum flange the design allows. These determine the tooling and sometimes the design. A hole placed too close to a bend distorts during forming, and the distortion is discovered at fit-up, when the board does not sit flat.

Fasteners and assembly logic

Which fasteners, in which positions, and whether parts are welded or riveted. Also state the assembly sequence if one panel must go on before another, because a sequence that the drawing does not show becomes a rework instruction on the floor.

Acceptance

The standard the part will be judged against: which dimensions are inspected, with what instrument, and what the first-article report must contain. Agreeing this before cutting is the difference between a reject and a documented deviation.

Where the design is not final, send the model with the open items listed. A factory can quote around open items; it cannot quote around silence.

Materials, Finishes and Critical Tolerances

Three specifications that get merged into one line and then cause the argument.

A practical note on artwork. Printed panels and applied graphics have their own tolerances, and they interact with panel flatness. If a graphic must align to a cut edge, say so, because the alignment requirement travels back into the flatness requirement - and flatness is decided by material, forming and finish, in that order.

What the Factory Checks Before Cutting

A competent factory runs a check between receiving the files and starting the machine. Knowing what that check covers is the fastest way to judge a supplier.

  1. Drawing and model agreement. The PDF and the 3D file must describe the same part. When they disagree, the model is usually newer, and the difference must be confirmed in writing rather than assumed.
  2. Flat pattern and bend allowance. Whether the part can be unfolded with the available tooling, and whether the bend allowance assumed in the drawing matches the press brake setup.
  3. Tooling availability. Punch and die sizes for the specified holes, and whether a radius requires a special tool. A radius that needs a tool the factory does not have becomes a lead-time line.
  4. Hole-to-bend and edge distances. Whether the geometry is formable as drawn, which is where design and manufacturing most often negotiate.
  5. Assembly clearances and service access. Whether the parts, once formed, allow the board, display and peripherals to go in - and come out again for service.
  6. Finish sequence. Whether the part is finished before or after assembly, and whether masking is needed for earth points and threaded inserts.

Ask a supplier to describe this check. A supplier who can name the six steps is describing a process; one who says "we will review the drawing" is describing an intention.

Copyable Sheet Metal RFQ Checklist

Copy this into the enquiry. Mark each line present, absent or not applicable.

StageItem
All stagesDrawing revision identifier, consistent across files
All stagesQuantity per part and expected repeat volume
All stagesDestination market, if conformity work is expected
BudgetOverall dimensions and bounding box
BudgetMaterial and thickness, or acceptable range
BudgetFinish type, with colour and gloss reference if colour matters
PrototypeCritical hole positions with individual tolerances
PrototypeBend radius, hole-to-bend minimum, flange minimum
PrototypeFastener schedule and assembly sequence
PrototypeSurface treatment of earth points and threads (masking)
PrototypeAcceptance dimensions and first-article report format
ProductionSampling plan and inspection frequency
ProductionChange-control route and revision discipline
ProductionPacking specification and unit protection

The pricing mechanics that sit on top of this checklist - base set, options, header fields - are on the cabinet quote structure page, and the wider cost view on machine cost structure.

FAQ

What files does a sheet metal fabricator need for a first quote?

A drawing with a revision identifier, overall dimensions, quantity, material and thickness, and the finish required. That is enough for a budget-stage quote. Prototype and production quotes need critical dimensions, tolerances, fasteners and an acceptance standard on top.

Is a STEP file enough without a drawing?

A model gives geometry but not intent. Without a drawing, tolerances, finishes, fastener details and inspection points are left to the factory's assumptions. Send both, and say which one governs if they disagree.

Why does hole-to-bend distance matter?

Because a hole placed too close to a bend distorts during forming. The distortion shows up at fit-up, when a board or bracket does not sit flat, and the fix is usually a drawing change and a new part rather than an adjustment.

Should I specify one tolerance for the whole part?

No. A blanket tolerance tells the factory that no dimension is critical, which is rarely true for a gaming cabinet. Mark the dimensions that carry a mounting pattern or an interface, give them their own tolerances, and let a general note cover the rest.

What should a first-article report contain?

The dimensions that were inspected, the instrument used, the measured values against the drawing tolerance, and the disposition of any out-of-tolerance result. Agree the format before the first cut, because a report produced after a reject is a negotiation document rather than an acceptance record.