Key Takeaways

  • Machines are often half the load — HVAC and lighting can match or exceed them.
  • Size service at 125% of calculated load for code headroom, not at the bare number.
  • Use the total to confirm your venue's incoming supply before install.
For operators, distributors and venue buyers

Illustrative estimates based on operator-provided inputs. Actual results depend on market conditions, player behavior, and regulatory requirements. Licensing and compliance in your market are your responsibility — confirm your local rules.

How This Calculator Works

Venue load is a sum problem: machines + lighting + HVAC + peripherals, then × service factor. This tool lets a licensed operator estimate total venue load from four inputs — machine count and watts, lighting load, HVAC load, and peripheral load.

Everything runs in your browser. No inputs are transmitted or stored.

The Model

machine_load = machines × watts
total_load   = machine_load + lighting + hvac + peripherals
service_load = total_load × service_factor

The service factor is the code headroom — without it the panel runs at its limit and nuisance trips become routine.

A Worked Example

100 machines at 350 W, lighting 8 kW, HVAC 15 kW, peripherals 4 kW, 125% factor:

A 63 kW incoming supply would be undersized — the model catches it before install.

Size Before You Sign

Confirm the venue's actual incoming supply and local code with your licensed electrical contractor. Model the machine portion with the power consumption calculator first, then total it here.

Related Products

Explore the full set of operator tools on the Interactive Tools hub.

Entity context

complianceRTPhouse edgecertificationjurisdictionGLIBMMfirmwareutilizationtotal loadHVAClightingservice factorincoming supplypanel

Frequently Asked Questions

Why include HVAC and lighting?

A gaming floor's machines may draw 40–60% of the total; HVAC for a crowded room and full lighting make up much of the rest. Sizing service on machines alone trips breakers in week one.

What does the 125% service factor mean?

Electrical code typically requires service capacity above the calculated continuous load so the panel is not running at its limit. The calculator applies it so your quoted supply has headroom.

Does this replace a real load study?

No. This brackets the order of magnitude for planning. A licensed electrical engineer must do the stamped load calculation and panel design per local code before any install.

Do your cabinets publish wattage?

Yes — every GOLDPRIME GAME cabinet ships with a stated draw in its spec sheet, scoped per market and per order.

Need Venue Power Requirement Calculator scoped to your operation?

Tell us your market and volume — we'll come back with a tailored quote in ~72 hours.

Request a Quote →