Home / Resources / First Arcade Machines and Layout

How to Start an Arcade: What to Buy First and Where It Goes

How to start an arcade is decided on the floor plan before it is decided on the price list. The first order fails in two ways: buying types that cannot share a floor, and buying machines that cannot physically reach their position. This page fixes the mix by footprint and dwell time, then walks the layout and delivery checks that have to pass before the purchase order is signed. Budget figures are on the equipment budget checklist; the venue models are on the FEC solution page.

Key Takeaways

  • Draw the floor before the order. A machine type that cannot share a zone with the others costs you a corner you cannot sell.
  • Choose the first mix on two axes: footprint per unit and dwell time per player. Revenue per square metre follows from those two, not from the game title.
  • Service access is part of the footprint. A unit with no rear clearance is a unit that will be moved with a forklift every repair.
  • Check the delivery route - door width, lift, corners, floor loading - before ordering. It is the cheapest check and the most expensive to fail.
  • Aisle and accessibility dimensions are set by the local code and by the licensing inspection, not by a universal figure. Measure, then confirm with the project's own authority.
  • A first order with four types is enough to learn from. Five types on a small floor is a spare-parts problem disguised as variety.
Arcade and FEC floor with mixed machine types arranged in rows
A working floor mixes machine types by footprint and dwell time. The first order should be built to that mix, not to a single best-seller.
Diagram of a first arcade floor split into play zones, queue space, service access and delivery route
Four things to draw before ordering: play zones, queue space, service access behind each unit, and the delivery route to the final position.

The checklist at the end of this page is the deliverable. Everything before it exists to justify the numbers that go on it.

Start with the Space and the Audience

Three questions set the floor's character, and each one points at a different machine mix.

Only after these three are answered does the machine list make sense. The framing of mix by zone and by revenue potential is covered in the equipment mix framework; this page takes the mix as given and deals with the physical order of the first purchase.

Pick a First Machine Mix

Four types cover a first floor. The labels below are functional, not model names, so they can be replaced without changing the structure of the plan.

TypeFootprint behaviourDwell timeRole on the floor
Core video or skill cabinetStandard single-unit footprint; rows wellShort to medium, repeat visitsVolume. Carries the count and the routine revenue
Redemption or pusher unitWider front, needs queue space in front of itLong, family-drivenFootfall and ticket flow to the prize counter
Large-format centrepieceLargest footprint, needs clearance on all sidesLong, spectatedAnchor. Draws traffic and sets the venue's perceived quality
Specialty unitVaries; often the hardest to placeNicheDifferentiation, or a licence requirement

Three rules keep a first mix honest. Keep the core type as the majority, because it is the one with predictable revenue and cheap spares. Buy at most one centrepiece, because a second one competes with the first for the same attention. And treat the specialty unit as a decision to be justified by a named audience, not by novelty - it is the unit that becomes a spare-parts liability fastest.

Record the reason for each type on the list. When the budget tightens, the reason is the only thing that tells you which line to cut.

Plan the Floor Layout: Queues, Service Access and Power

Layout is four layers drawn on the same plan, in this order.

Layer 1 - play zones

Group by audience and by sound. Redemption units cluster near the prize counter because the ticket flow physically moves that way. Competitive and large-format units cluster away from the entrance conversation zone. Mixing the two in one row produces noise complaints and a floor that reads as unstructured.

Layer 2 - queue space

Queue space is not aisle space. A pusher or redemption unit needs standing room in front of it that is not also the walking route, or the queue blocks circulation and the players behind it leave. Draw the standing zone as a separate shape on the plan and subtract it from the sellable area.

Layer 3 - service access

Every unit needs a service side: rear door swing, or a front-opening design that allows board and bill-acceptor access from the player side. The choice determines whether rows can be back-to-back. A row planned without service clearance looks efficient on paper and generates a machine-move on every repair. Ask the supplier for the service-access requirement per model before finalising the row spacing.

Layer 4 - power and network

Power points follow the rows, not the machines, so the plan should show outlet positions and whether the local supply matches the machines' configuration. Confirm the destination's voltage and frequency against the machine specification rather than assuming a universal supply. Network and management-system cabling follows the same logic; the electrical configuration note covers the frequency question.

Aisle widths and accessible-route requirements come from the local building code and from the licensing inspection. This page deliberately gives no universal figure: measure the room, then confirm the requirement with the authority that will inspect it.

Check Delivery Access Before Ordering

This check costs an afternoon and prevents the single most expensive category of opening-week failure. Walk the route from the kerb to the final position with a tape measure.

  1. Door and gate width. Measure the narrowest point, including the door frame, not the opening. A crated machine is wider than the machine.
  2. Lift or stair. Internal lift dimensions, door swing and weight limit. If there is no lift, count the turns on the stair - a large-format unit rarely survives a switchback.
  3. Corners and ceiling height. A unit that fits the corridor can still fail the corner. Check overhead obstructions, low beams and any step between floor levels.
  4. Floor loading. Banks of machines concentrate load. Confirm with the building's structural information, not with an assumption about a concrete slab.
  5. Position clearance. Confirm the final position allows the service access planned in the layout, and that the unit can be rotated into it.

If any check fails, the fix is a smaller form factor or a different position, and both are cheap before the order and expensive after. Photograph the route and attach it to the purchase order; it turns a verbal assurance into a shared assumption.

Where Licensing, the Business Plan and Franchises Fit

Three decisions sit around the machine list and get confused with it. None of them changes what a supplier quotes; all of them change whether the order should be placed at all.

Licensing and permits

What you need depends on the jurisdiction and on whether the venue is amusement-only or offers cash or ticket prizes. The workable approach is to ask the inspecting authority for the current requirement in writing before signing a lease, and to record who confirmed it. Machine specification, payment peripherals and site layout all follow from that answer, so it belongs before the purchase order rather than after it. Suppliers can tell you what a machine is configured with; they cannot tell you what a regulator will require.

The business plan and the equipment line

An arcade business plan is mostly a demand and cost argument, and the equipment section is the part suppliers can actually support. Build it from a machine mix with per-type quantities, then attach the operating assumptions - opening hours, price per play, utilisation, staffing. If the plan states a total investment without the equipment line itemised, the number cannot be defended in a lending conversation. The equipment budget checklist gives that line its structure.

Franchise or independent

A franchise buys a proven mix, a brand and a supplier relationship, and charges for all three. An independent build buys freedom over the mix and the machine choice, and pays for it in research time and in the risk of a wrong first order. The practical difference for a first-time operator is not the fee: it is who carries the cost of a bad equipment decision. If you go independent, the layout and delivery checks on this page are the risk control that a franchisor would otherwise supply.

First-Order Equipment Checklist

Send this completed. It is the document that makes the quotation comparable and the delivery plannable.

ItemWhat to record
Floor planScaled plan with play zones, queue space, service access and power points marked
Machine listTypes by function, counts, and the reason each type is present
Perimeter and footprintBody footprint and required service clearance per type, stated separately
Route surveyNarrowest door, lift dimensions, corners, floor loading, photographs
ElectricalDestination voltage and frequency, outlet positions, total connected load
Payment pathCoin, note, ticket-out or card, and whether a redemption terminal is in scope
Accessibility and fireThe local requirement you are building to, and who verified it
Target dateOpening date and the artwork approval date that triggers production

With this in hand, a supplier can quote per type with the service clearance stated, and the forwarder can price the lane against a real crated volume. The site-selection questions that come before all of this are on the FEC site selection page.

FAQ

How many machines should a first arcade order include?

Enough to fill the planned zones without filling the room. Leave space for circulation, queueing and at least one future position, because a floor that is completely full at opening has no room to correct a wrong bet. Four machine types is usually enough variety for a first order.

What aisle width should an arcade plan use?

The width required by the local building code and the licensing inspection, measured in the actual room. There is no universal figure worth quoting, because accessibility and fire-escape rules differ by jurisdiction. Measure the room, confirm the requirement with the inspecting authority, and record who verified it.

Do machines need space behind them?

It depends on the service design. Rear-service cabinets need door swing clearance at the back; front-service designs allow board and acceptor access from the player side and can be placed back-to-back. Ask for the service-access requirement per model before fixing row spacing, because it changes the number of units a room can hold.

Should the centrepiece machine be bought first?

Buy the core type first in volume, and at most one centrepiece. The centrepiece sets perceived quality and draws traffic, but a second one competes with the first for the same attention and consumes the space that core units would have earned from.

What is the most common layout mistake in a new arcade?

Treating queue space as aisle space. Redemption and pusher units generate a standing queue in front of them, and if that area doubles as the walking route, circulation collapses and the players behind the queue walk away. Draw the standing zone as a separate shape.

Send Your Floor Plan

Send the scaled plan, the floor area, the audience you expect and your opening date. We will return a per-type placement proposal with the service clearance stated, plus the delivery-route questions to settle before the order.

Send Your Floor Plan